0434 954 611nic@tidyearthworx.com.auGympie · Mary Valley · Sunshine Coast · Fraser CoastDone Once · Done Right · Done Tidy

Dam construction, reshaping and desilting

New dam builds, cleaning out and reshaping existing dams, plus contour banks, tracks and general property earthworks. Practical work that improves how water moves across the place and how you get around it.

New builds
& desilting
Also
tracks, contour banks
Best season
dry, autumn to spring
★★★★★5.0 · 9 Google reviews
Owner-operated, you deal with Nic
GPS machine control on every job
ABN 23 693 609 835
Aerial view of bush with ground cleared to red soil between the treesAerial

New dams

The dam is only as good as where it is put. A dam in the wrong gully catches nothing; a dam with a poorly keyed wall leaks quietly for years. Before any machine moves we will walk the site with you and look at the catchment above it, the shape of the ground, and what the soil is doing when you dig into it.

The wall gets a proper key trench cut into competent material and the fill goes in and gets compacted in layers. Spillway sized and shaped so it can pass a decent event without cutting into the wall. That is the difference between a dam that holds and a dam you are repairing in three years.

Soil testing can be arranged to confirm the soil type and clay content, and test holes are dug to make sure there is enough clay type material to hold water.

Cleaning out and reshaping

Most older dams on properties around here have lost a good share of their capacity to silt. Cleaning one out is usually far cheaper than building a new one, and the spoil that comes out is generally good material for banks, pads or filling low spots elsewhere on the property.

Best done in a dry stretch, autumn through spring generally, when the dam is low enough to get a machine in and the material can actually be handled.

Other machinery can be arranged, such as excavators and all terrain dump trucks to cart the silt or help with the job.

Contour banks, tracks and general property work

Diversion banks above buildings and yards, access tracks that stay usable after rain, laneways, table drains, and levelling out the ground where you need it flat. The dozer suits this kind of work, it moves a lot of material efficiently.

Common questions

What is the best time of year to build or clean a dam?

The dry months. Around here that generally means anywhere from autumn through to spring. Wet ground makes compaction difficult and makes desilting a mess, the material will not handle.

Do I need approval to build a dam?

It depends on the size, the catchment and where it sits. Smaller stock and domestic dams often do not, but it is worth a call to the council or the relevant water authority before committing. Happy to point you in the right direction.

Can the spoil from a desilt be used elsewhere?

Usually, yes. Dam silt is often good material for building up low ground, forming banks or topping tracks. We will put it somewhere useful rather than just pushing it into a heap.

Talk to Nic

Owner-operated. Your call goes straight to the bloke running the machine.

0434 954 611Call now

A GPS dozer, not a guess

Most dozers on jobs this size run off pegs and a string line. This one runs off the design file. The blade knows where it sits against the surveyed surface. Fewer passes, less over-cut, and a level you can actually check against the drawing.

Model
CAT D6T
Class
~20 t
Guidance
GPS control
Attachment
Stick rake

Need a pad, a dam or a dozer?

Tell Nic what the job is and where it is. You will get a straight answer and a real price estimate.