Hire the dozer with Nic on it. Wet hire means the machine, the operator, the fuel and the insurance come as one rate, you are not chasing a separate operator or carrying the risk.

One rate, one invoice. The machine turns up with an operator who knows it, fuelled and insured, and it goes home the same way. You are not sourcing an operator separately, you are not carrying the plant insurance, and you are not managing someone else's machine on your site.
For builders and civil contractors that is usually the point, it is one less thing on the list, and if something goes wrong with the machine it is our problem, not a hole in your program.
Machine control is common on the big civil jobs and rare on the smaller ones. This dozer has it, which means it can work directly off a design file rather than off pegs. On trim work and pad work it takes passes out of the job, and it gives you a surface that can be checked against the same file the engineer issued.
If you have not used a GPS machine on a job this size before, it is worth a conversation, it changes what is worth doing with a dozer versus what you would normally put an excavator and a surveyor on.
Hourly hire with a minimum of 2 days of work. Float is arranged on request and quoted separately depending on the distance. We work across Gympie, the Mary Valley and down onto the Sunshine Coast, outside that, ring and ask.
Wet hire includes the operator, fuel and insurance in the rate. Dry hire is the machine only and you supply a ticketed operator and carry the insurance. We do wet hire.
Yes, a minimum of 2 days of work. To get the most out of the float cost, it is a good idea to line a few jobs up at once, for example a small house pad with a driveway or a dam.
Float is charged one way for jobs within our service area, a 100 km radius from Amamoor. Outside that, it is charged both ways, mobilisation and demobilisation.
Owner-operated. Your call goes straight to the bloke running the machine.
0434 954 611Call nowMost dozers on jobs this size run off pegs and a string line. This one runs off the design file. The blade knows where it sits against the surveyed surface. Fewer passes, less over-cut, and a level you can actually check against the drawing.
Tell Nic what the job is and where it is. You will get a straight answer and a real price estimate.