Trim work for sites and pads that have to hit exact levels and gradients to control water. The dozer runs off a design surface with GPS machine control, so the pad comes up on grade and the next trade is not having to reshape or dig out the pad unnecessarily.

Bulk earthworks get a site roughly to shape. Final trim is the pass that takes it from roughly right to actually right, the surface the slab, the pavement or the pad is going to sit on. Get it wrong and someone is paying for extra concrete, or re-shooting levels, or carting material back in.
Most small operators do this off pegs and a string line, checking with a laser as they go. That works, but it is slow and it depends heavily on how good the operator's eye is on the day. We run GPS machine control, which means the blade knows where it is against the surveyed design surface in real time.
Fewer passes, because the machine is not guessing and then correcting. Less over-cut, which means less imported fill to bring the level back up. And a finished surface that can be checked against the same design file the engineer issued, rather than against someone's memory of where the pegs were.
On a tight residential site that might save half a day. On a larger pad it can be the difference between one machine for two days and two machines for three.
The design file or the level sheet, site access, and a clear run at it. If the surveyor has already set out and there is a control point on site, even better. If there is no design file, we can still set a level you are happy with and put a specified fall on the pad, 1 to 2%, to control water.
Generally within about 30 mm on a final trim surface with GPS running off a radio base station, or about 50 mm running on the mobile network where the site has good coverage. That suits most residential and light commercial work. Tighter than that is possible on smaller areas, worth a conversation about the specific job.
Yes. On smaller sites the same machine does the bulk push and the final trim, which usually works out cheaper than bringing in a second operator for the finish.
Yes. Send through the design file or the level sheet and we will load it into the machine before we arrive on site.
Owner-operated. Your call goes straight to the bloke running the machine.
0434 954 611Call nowMost dozers on jobs this size run off pegs and a string line. This one runs off the design file. The blade knows where it sits against the surveyed surface. Fewer passes, less over-cut, and a level you can actually check against the drawing.
Tell Nic what the job is and where it is. You will get a straight answer and a real price estimate.