House and shed pads, cut to engineered levels

Cut, fill and compact a stable building pad for a new home, shed or machinery bay. Batters shaped, levels set to the engineer's drawing, and the surrounds left tidy so the slab crew can get straight into it.

Cut & fill
to engineered RL
Batters
shaped and trimmed
Typical duration
3 to 5 days
Compaction
Level 1 testing available
★★★★★5.0 · 9 Google reviews
Owner-operated, you deal with Nic
GPS machine control on every job
ABN 23 693 609 835
Freshly pushed earth on a hillside under a blue skyPushed earth

Building on ground that will not move

A house pad is not just a flat patch of dirt. It is the platform your slab sits on, so it has to carry the load without settling unevenly. It has to shed water away from the building, not toward it. And it has to finish at the exact level your engineer specified.

Most problems that show up years later start with a rushed pad. Cracked slabs and water pooling against the footings are the usual signs. The cause is often topsoil left under the fill, or fill that was not benched into the existing ground to hold the pad in place.

We cut to the design level, place and compact fill in layers rather than dumping it in one lift, and shape the batters so they hold rather than slumping into the pad the first time it rains properly. Fill is moisture conditioned and compacted with a padfoot roller to guarantee compaction, and Level 1 compaction testing can be arranged.

Sheds, machinery bays and hardstand

Shed pads get built the same way as house pads. The load cases are different, a machinery shed with a loaded truck on it is a different problem to a slab-on-ground house, but the principle does not change. Level, compacted, drained, and finished to a surface the concreter can work off.

If the shed is going on a slope, that is a cut-and-fill job and the batter design matters more than the pad itself. Worth getting on site to look at before quoting.

Drainage and the bits people forget

Where does the water go once the pad is in? On acreage blocks around Gympie and through the Mary Valley that question decides a lot. We will usually shape a diversion above the cut so runoff goes around the pad rather than across it, and get the surface falling the right way before we leave.

Common questions

How long does a house pad take?

Most residential pads on reasonable ground are a three to five day job depending on how much cut and fill is involved and how far material has to be moved. Steep blocks take longer.

Do we need an engineer's drawing first?

It depends on what your builder has specified. For anything that is going to carry a slab, the pad has to be built to the level and the specification on that drawing, and a geotechnical engineer will need to carry out compaction tests during construction. For a simple hardstand or a machinery bay it is usually not needed.

Can you bring in fill?

We can arrange it. On most jobs there is enough material on site to balance the cut and fill, which is cheaper than carting material in.

Talk to Nic

Owner-operated. Your call goes straight to the bloke running the machine.

0434 954 611Call now

A GPS dozer, not a guess

Most dozers on jobs this size run off pegs and a string line. This one runs off the design file. The blade knows where it sits against the surveyed surface. Fewer passes, less over-cut, and a level you can actually check against the drawing.

Model
CAT D6T
Class
~20 t
Guidance
GPS control
Attachment
Stick rake

Need a pad, a dam or a dozer?

Tell Nic what the job is and where it is. You will get a straight answer and a real price estimate.